Monthly Archives: April 2016
Bremer Bay – Joists Going Down
Timber work begins Nino (builder) arrived last week and oversaw the ground floor “Secret Men’s Business ” concrete pour. Monday 25 April 2016: The strapped bundles of bearers were found then cut to length, positioned and bolted onto the steel footplates … Continue reading
Bremer Bay – Concrete Pour
The concrete floor: Friday April 20 2016 Its time to pour the floor of “The Secret Men’s Business” It’s the only cement floor in the house, all the rest being upstairs with timber over warmboard or a subfloor with carpet or tiles over. … Continue reading
Bremer-Bay Timber Arrives
Timber arrives onsite: The timber order arrived onsite from Perth 550 kms away today. The truck and semi- trailer had a challenge negotiating our drive-way to the house site. The one man unloading operation began. Unfortunately he has placed it too close … Continue reading
Bremer Bay – Warmboard
WARMBOARD ARRIVES Our underfloor hydronic heating system Warmboard arrives on site. This product is being used to heat the first floor. 5- 23kW modulating heat pump is being used as the heat source to drive the system. The background to … Continue reading